Bathtub Installation Services in Orlando, Florida
Replacing or installing a new bathtub requires more than just removing the old unit and setting down a new one. In Orlando-area homes built in the 1990s through 2010s-especially in subdivisions like Baldwin Park, Thornton Park, and College Park-existing plumbing may need reinforcement or rerouting to support modern soaking tubs or walk-in models. Bill Morgan inc evaluates your current drain system, supply lines, and structural framing before beginning work. We use premium silicone sealants rated for Florida's humid climate, install proper slope on drain lines to prevent mold growth, and ensure all connections meet current plumbing codes enforced by Orange County.
Our bathtub installation process begins with a site inspection and measurements of your bathroom space-critical for homes in Winter Springs, Sanford, and Maitland where older bathroom layouts sometimes have space constraints. We turn off water supply, disconnect the existing tub drain and overflow, remove old caulking and fixtures, and carefully extract the bathtub to avoid damage to surrounding walls. Next, we inspect and repair the subfloor and framing if needed, position the new tub using adjustable feet for proper leveling, reconnect supply lines with shut-off valves, seal the drain connection with plumber's putty and silicone, and apply waterproof caulk around all edges. Final steps include testing water pressure and drainage, applying grout if a tile surround is involved, and a full walkthrough explaining care and maintenance.
What Is Included
When you hire Bill Morgan inc for bathtub installation, here is exactly what you get:
- Professional removal and disposal of old bathtub and fixtures
- Inspection and repair of subfloor, framing, and plumbing rough-in if damage found
- Installation of new bathtub with adjustable feet and proper leveling
- Supply line connection with hot and cold water shut-off valves
- Drain line connection, P-trap assembly, and overflow pipe installation
- Waterproof silicone sealant application around tub perimeter and edges
- Testing of water pressure, drainage flow, and leak detection throughout system
Signs You Need Bathtub Installation
- Visible cracks or chips in existing bathtub enamel or fiberglass
- Persistent mold or mildew around tub surround despite cleaning
- Water stains or soft spots in bathroom wall or floor near tub
- Slow draining or backup when tub is filling or emptying
- Cold spots when running hot water or inconsistent water temperature
- Deteriorating caulk or grout separation around tub edges
- Rust stains or discoloration from aging cast iron or galvanized pipes
- Outdated single-handle faucet or non-functioning overflow control
Our Bathtub Installation Process
Initial Consultation and Measurements
We schedule a site visit to your Orlando, Winter Park, Oviedo, or surrounding area home. Our technician measures bathroom dimensions, evaluates existing plumbing access, checks water pressure, inspects current drain configuration, and discusses your bathtub style preferences. Consultation typically takes 30-45 minutes and includes a written estimate.
Preparation and Old Tub Removal
On installation day, we shut off water supply at the main or local valve, disconnect hot and cold supply lines, disconnect drain and overflow pipes, remove old caulk using a utility knife, and carefully extract the existing bathtub. Removal takes 2-4 hours depending on tub weight and how well it is sealed. We haul away all debris responsibly.
Subfloor and Framing Inspection
Once the old tub is removed, we inspect subfloor condition, framing integrity, and plumbing rough-in. If soft spots or rot are found-common in homes near Altamonte Springs and Lake Mary where humidity is high-we reinforce or replace damaged wood. We also verify that drain slope is at least 1/4-inch per foot to prevent standing water.
New Bathtub Positioning and Leveling
We position the new bathtub in the alcove or bathroom space and use adjustable feet to achieve perfect level in both directions. Proper leveling prevents water pooling and ensures smooth operation of drain and overflow mechanisms. This step takes 30-60 minutes and is critical for durability.
Plumbing Connections and Testing
We connect hot and cold supply lines using flexible PEX tubing or rigid copper with proper shut-off valves installed within 12 inches of the tub. We connect the main drain to existing plumbing with an approved P-trap, set the overflow pipe, apply plumber's putty to all threaded connections, and test water flow and pressure. Testing takes 45 minutes and ensures zero leaks.
Sealing, Caulking, and Final Walkthrough
We apply premium waterproof silicone caulk around all edges where the tub meets walls and the surround material. Caulk cures for 24-48 hours before water exposure. We provide care instructions, explain warranty coverage, and schedule a follow-up inspection one week after installation to ensure all seals remain intact. Total project time is 1-3 days.
Types of Bathtub Installation We Handle
- Acrylic soaking tubs with reinforced walls and non-slip base for modern comfort and durability
- Fiberglass bathtubs offering lightweight installation and lower cost for budget-conscious homeowners
- Cast iron clawfoot tubs for classic vintage or farmhouse bathroom aesthetics in homes across Orlando
- Walk-in tubs with grab bars and low thresholds for aging-in-place accessibility and safety
- Jetted and whirlpool tubs with multiple hydrotherapy jets and blower systems for spa-like relaxation
- Japanese soaking tubs in small footprints ideal for compact bathrooms in Winter Springs and Casselberry
- Tile-in or drop-in bathtubs that integrate seamlessly with custom tile surrounds and shower enclosures



